Study

STEM Group Roles

  •   0%
  •  0     0     0

  • Who draws the group plan?
    Head Architect
  • Who decides what parts of the design each team member will build?
    Head Architect
  • Who makes sure all group members are using the materials safely and correctly?
    Materials Manager
  • Who determines if more testing will be conducted?
    Testing Coordinator
  • Name a job responsibility of the Head Architect.
    Varies
  • Who asks the teacher for help when needed?
    Team Captain
  • Name a job responsibility of the Testing Coordinator.
    Varies
  • Who makes sure all group members are on task and participating?
    Team Captain
  • Who makes sure that the design meets all of the requirements?
    Head Architect
  • Who makes the final group decisions after team discussion?
    Team Captain
  • Who collects and organizes materials?
    Materials Manager
  • Who decides what roles each team member will play during testing?
    Testing Coordinator
  • Name a job responsibility of the Materials Manager.
    Varies
  • Who decides how to test?
    Testing Coordinator
  • Who encourages the team?
    Team Captain
  • Who decides when the design is ready for testing?
    Head Architect
  • Who makes sure that all tests are conducted safely and accurately?
    Testing Coordinator
  • Name a job responsibility of the team captain.
    Varies
  • Who understands and communicates the correct uses for each material?
    Materials Manager