What are the three CHARACTERISTICS OF MATERIALS USED IN SPECIFIC PROJECTS?
Selection of materials, Testing of materials, cost of materials
Oops!
Check
Okay!
Check
15
Making a list of products/materials to buy is a good trait of a wise consumer.
TRUE
Oops!
Check
Okay!
Check
lifesaver
Give 25 points!
Oops!
gift
Win 20 points!
Okay!
fairy
Take points!
5
10
15
20
25
thief
Give points!
5
10
15
20
25
15
Consumers are also considering the tag or name of the company which is producing great quality of materials and is known in the market.
TRUE
Oops!
Check
Okay!
Check
15
The ability to evaluate the materialâs impact on the performance of a product is critical for reliable performance.
TRUE
Oops!
Check
Okay!
Check
15
What is use to request, assign and track work that needs to be accomplished by Facilities Operations for maintenance, repair, and minor construction work?
Work Order
Oops!
Check
Okay!
Check
baam
Lose 5 points!
Oops!
magnet
Take 10 points!
Okay!
rocket
Go to first place!
Okay!
banana
Go to last place!
Oops!
15
Work order objective is to establish a standard operating practice to receive, assign, and track requests for work orders.
TRUE
Oops!
Check
Okay!
Check
15
What system requirements means you can be sure that the materials will perform its function well, will operate safely, and will give the best it could give?.
Reliable
Oops!
Check
Okay!
Check
eraser
Reset score!
Oops!
gold
Win 50 points!
Okay!
gift
Win 15 points!
Okay!
lifesaver
Give 25 points!
Oops!
15
Work order serves to document the completion of work and to record all costs associated with that work.
TRUE
Oops!
Check
Okay!
Check
15
What type of work order is created for routine repair and/or maintenance of buildings and campus facilities?
Corrective work order
Oops!
Check
Okay!
Check
15
Corrective Work Orders include non-maintenance work such as building new shelves, hanging whiteboards, hanging banners.
FALSE
Oops!
Check
Okay!
Check
15
Preventive maintenance is a work order automatically generated on a scheduled frequency to ensure that routine maintenance is performed.
TRUE
Oops!
Check
Okay!
Check
15
Testing of materials is done to obtaining data for a project, performing failure analysis, or understanding material interactions.