T/F. The PERT formula calculates the simple average of three estimates.
False. PERT calculates the weighted average of three estimates.
Oops!
Check
Okay!
Check
15
×
Both PERT and the Three-Point estimate technique use all of the following estimates in their calculations except for which one?
Pessimistic
Optimistic
Least Likely
Most Likely
Oops!
Show
Check
Okay!
Check
15
×
What is free float?
Free float refers to the amount of time that a task can be delayed without delaying the start of the immediate successor task.
Oops!
Check
Okay!
Check
15
×
A critical path task is a task with which type of float?
Total float
Free float
Summed float
Zero float
Oops!
Show
Check
Okay!
Check
×
eraser
Reset score!
Oops!
×
gift
Win 10 points!
Okay!
×
fairy
Take points!
5
10
15
20
25
×
banana
Go to last place!
Oops!
15
×
This technique attempts to smooth out the resource assignments.
Resource leveling
Oops!
Check
Okay!
Check
15
×
This is the longest full path on the project.
Critical path
Oops!
Check
Okay!
Check
×
baam
Lose 20 points!
Oops!
×
gold
Win 50 points!
Okay!
×
rocket
Go to first place!
Okay!
×
baam
Lose 15 points!
Oops!
15
×
Which of the following are required in regards to quality processes on a project:
Policies
Regulations
Standards
Organizational quality policies
Oops!
Show
Check
Okay!
Check
15
×
What is total float?
Total float is the amount of time that a task can be delayed without delaying the project's overall completion date.
Oops!
Check
Okay!
Check
15
×
Add this type of time to the project schedule to account for unforeseen circumstances.
Contingency time.
Oops!
Check
Okay!
Check
×
baam
Lose 20 points!
Oops!
×
gift
Win 20 points!
Okay!
×
rocket
Go to first place!
Okay!
×
banana
Go to last place!
Oops!
×
Restart
Review
Join for Free
;
Your experience on this site will be improved by allowing cookies.
Allow cookies